top of page
Work Order Status
View the status of your previously submitted work orders. Work orders submitted prior to 10/2022 will not be updated. If you have a question about the information in this table, please contact Jeremy Lamont at jeremy.lamont@tcatmemphis.edu.
Submission Time | Last Name | Department/Program | Description | Update | Completed | Tech |
|---|---|---|---|---|---|---|
07/08/2026 | Sawe | Aviation Maintenance Technology | Joyner office no air. | adjusted temp in Office | Yes | Bell |
07/08/2026 | Taylor | Testing Center | Good morning,
I need the boxes for the HCT program delivered to Compass school located at 61 N McLean Blvd, Memphis, TN 38104 after 10am tomorrow July 9th if possible. Chef Joshua House or Carolyn Williams will be the instructors receiving the packages. | No | ||
07/08/2026 | Childress | Building Construction Technology | Hallway light needs attention. Light comes on, but, doesn't stay on and the motion detection is not working.
Thank you | No | ||
07/08/2026 | Sawe | Aviation Maintenance Technology | Maintenance room leak. | boiler wasnt working . hard reset and lines needed to purged from air. | Yes | Bell |
07/08/2026 | Young | Aviation Maintenance Technology | Several areas in the building are without air conditioning. The front office, Recips Shop, Structures shop...I am not sure of all of the areas without the air conditioning but it is too hot for this. | adjust the air temp in all the class rooms | Yes | Bell |
07/08/2026 | Sawe | Aviation Maintenance Technology | Need at least 10 chargers for walkies. | New chargers for walkie talkies have been ordered. | No | Bell |
07/08/2026 | Sawe | Aviation Maintenance Technology | Please replace old student microwaves with new ones. | Replaced old microwaves with new ones. | Yes | Bell |
07/08/2026 | Kerley | Building Construction Technology | The masonry contractor has left materials and equipment blocking emergency exits. The dust levels in the classroom, shop, and stairwells is excessive and I am sure the HVAC filters are clogged because of it. I tied up the dangling metal with caution tape yesterday before leaving. Who will be handling the cleanup behind the contractor? Will the hallway exit path be reopened for student use? We only have a single point of entry / exit for the classroom at this point. | No | ||
07/07/2026 | Kerley | Building Construction Technology | Condensate leak flooding hallway outside mechanical room at BCT classroom | Unclogged drain line. | Yes | McIvor McDaniel |
07/07/2026 | Kerley | Building Construction Technology | The roll up door without the new opener is squealing very badly when opening. I'm guessing the heavy masonry dust is creating a problem. Please clean and lube it as they continue to use it. | No | ||
07/07/2026 | Harris | Electronics | Please power on the air for Classroom S-223. | Unit just got replaced. Job still not finished. | No | McIvor |
07/07/2026 | Blackwell | Computer Information Technology | A\C leak in main classroom. I have placed a trash can under the leak for now. | Found 3-way valve leaking. | Yes | McDaniel |
Updates
bottom of page
